obstkompost
PROOP
2 months ago
I restored a backup in environment E1 via Railway. A new volume was created from the backup and mounted with the database. The problem is that the volume, which is no longer mounted, is still linked to the mounted volume in another environment, E2.
I’ve tried several times to delete the old volume in environment E1, but it didn’t work because it’s probably still linked to the E2 environment (This is just a guess on my part)
How can I get the two currently mounted volumes to sync with each other? When I try to sync, Railway in E2 attempts to create a new volume and mount it with the database. However, my data would be missing from the new volume.
0 Replies