performance on railway metal is terrible
strellic9
PROOP

7 months ago

performace on metai is much worse for me, most likely biggest part is PSQL side, i dont have decent monitoring to know for sure. One of background tasks that took 15sec (scr1) right before transition to metal, right after it takes 75-80sec (scr2). This task relies on PSQL a lot. Ofc i didnt deploy any changes in code between these 2 screenshots. Because of this terrible performance some endpoints responses take 1-2sec, which didnt happen before transition

ive tried migrating back to EU legacy on dev, same code, task completion time came back to 15sec. Ive waited for sunday to do the same on production, but now this option doesnt show. What do i do?

also transition to metal was done in production without my consent or even warning. We have an important system which relies on static IP, IP changed, hence system didnt work for few hours. Even better - after PSQL migration backend server wasnt restarted for 3 hours, and didnt work at all. Why woulld you do such a thing, whats the idea? even if you force thansition, why not give me a chance to do it controlled, by myself?

UPD: great, dev environment got auto-migrated to metal too, and now simple endpoints with like 20 objs from PSQL take 3-20seconds to load. Not sometimes - always. Will be even better when production reaches the same level

Closed

0 Replies

Status changed to Closed itsrems 8 months ago


Loading...